翻訳と辞書
Words near each other
・ NetWare Loadable Module
・ NetWars
・ NetWeaver Developer
・ Netwerk
・ Netwide Assembler
・ Netwitness
・ Network
・ Network (album)
・ Network (comics)
・ Network (film)
・ Network (lobby group)
・ NETWORK (Slovak party)
・ Network (TV series)
・ Network (video game)
・ Network 18
Network 2011
・ Network 21 (television station)
・ Network 23
・ Network 23 (company)
・ Network 23 (record label)
・ Network 26
・ Network 7
・ Network Abstraction Layer
・ Network Abuse Clearinghouse
・ Network Access Control
・ Network Access Device
・ Network Access Identifier
・ Network Access License
・ Network access point
・ Network Access Protection


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Network 2011 : ウィキペディア英語版
Network 2011
Network 2011 was a plan for transit expansion created in 1985 by the Toronto Transit Commission. It was centred on three proposed subway lines: the Downtown Relief Line, Eglinton West Line, and the Sheppard Line. Eventually only a portion of the Sheppard Line was built, while construction on the Eglinton line was started and then abandoned.
==The plan==
The 1970s had seen the end of new expressway construction in Toronto, and the preservation of the Downtown streetcar system. In 1972, while construction was underway on the Spadina Subway line, the provincial government of Bill Davis introduced the GO-Urban transit plan for the Toronto region. Rather than build either subways or light rail, the plan would build a network of innovative maglevs to ring Metro Toronto. The maglev project failed, and the province switched to supporting UTDC's Intermediate Capacity Transit System. An initial line was built, the Scarborough RT, but it went greatly over budget and no further lines were attempted.
Network 2011 was designed to meet the needs of a rapidly growing city where building new expressways was politically impossible. There was also strong resistance to further intensification of the downtown core. The same spirit of activism that had stopped the Spadina Expressway and saved the streetcars also blocked residential redevelopment projects such as the plans for Trefann Court and Kensington Market. Community activists also opposed more downtown office towers, and as a result the city plan called for the creation of three suburban "subcentres" that would become central business districts independent of the core: North York City Centre, Scarborough City Centre, and Etobicoke City Centre. Improving transit to these areas was a central focus of the plan.〔Robin Harvey. "Shaping tomorrow's suburbs." ''Toronto Star." April 7, 1984. pg. A22〕
The GO-Urban and ICTS experiments being failures, the TTC was unwilling to again risk anything experimental, and the plan called for future transit expansion to use subways of the same design as the existing lines. The plan did not consider using the CLRV and ALRV streetcars which were being delivered at the time to run on the downtown tracks.
Under the lead of planner Jiri Pill, the TTC delivered a plan to Metro Toronto in May 1985 calling for a near doubling of Toronto's rapid transit lines. The Network 2011 plan had five elements to be built over the next 28 years and would cost an estimated $2.7 billion:
*Sheppard Subway Line from Yonge to Victoria Park, the top priority with work hoped to begin almost immediately. Estimated cost of $500 million
*Downtown Relief Line running from Union Station to Donlands Station to relieve pressure on the Yonge-Bloor Station. Estimated to cost $565 million and open in 1998.
*Temporary busway on Eglinton West to be completed by 2003 and would cost $365 million
*Sheppard Phase 2, extension of the Sheppard Line east from Victoria Park to Scarborough Town Centre and west to Dufferin. Opening in 2009 at an estimated cost of $740 million
*Replacement of the Eglinton busway with either light rail or a full subway. Construction to begin in 2011 and cost of $425 million.
*Also attached to the plan, but not an official part, were the Harbourfront and Spadina LRT lines that were already underway when the plan was announced.〔Michael Smith. "$2.7 Billion Metro transit plan called affordable." ''Toronto Star." May 29, 1985. pg. A1〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Network 2011」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.